Skip to content
Back to Projects
Enterprise AutomationActive

Despatch: UAE

UAE's cross-industry PINT-AE readiness engine for the Jan 2027 heavily impacted sectors — Construction & Real Estate, Wholesale/Distribution & Logistics, Technology/Telecom & Professional Services, and Energy & B2G. From dirty PDFs and spreadsheet pricing to 51-field Peppol invoices that clear on first submit — provisional billing, 1-Fils rounding, multi-currency MSA and reverse-charge solved before the mandate.

Live system: Cross-industry readiness engine: master data hygiene → 51-field PINT-AE validator → heavily impacted packs (Construction/Wholesale/Tech/Energy) with provisional

51/51 passed
PINT-AE Fields
AED 5k+/mo
Penalty Prevented
5 days
Go-Live
Tally · Zoho · SAP
ASP Shortlist
Free 20-min discovery + 48h ROI audit Production-grade, not a demo2 days to first value
Master data 100% Peppol-addressableGap check catches BR rejects before network • Borderline flagged
Why this vs status quo
Do nothing
51/51 passed lost
Manual Enterprise Automation
Build in-house
6–12 months
Hire + maintain
Despatch
AED 5k+/mo
Weeks, not months
TRN / Peppol ID Hygiene Scan • 51-Field PINT-AE Gap Check
Save ~10×

What ships

  • TRN / Peppol ID Hygiene Scan — Bulk scan of customer/supplier masters for missing or wrong …
  • 51-Field PINT-AE Gap Check — Run your last 10 real invoices through the full PINT-AE UAE …
  • Heavily Impacted Industry Rule Packs — Four plug-in packs: Construction (retention 5-10%, milestone…
  • Provisional Billing → UUID-Linked e-Credit Notes — Provisional / milestone invoices + adjustments mapped to PIN…
  • ASP & ERP Connection Kit — Shortlists ASPs compatible with your ERP (Tally, Focus 9, Sa…
  • Rejection SOP + Corrected Template — Rejected invoice SOP (who fixes what in <24h), corrected PIN…

Human signs every critical step • Audit trail included

Sample output & architecture

DespatchProduction Blueprint
Dated 18 Aug 2026 • #DES-2026-041
PINT-AE Fields: 51/51 passedPenalty Prevented: AED 5k+/moGo-Live: 5 daysEnterprise Automation
Agents
Master Data Agent • PINT-AE Validator Agent • Industry Rule Pack Agent
Stack
PINT-AE UAE BIS, Peppol BIS 3.0, Peppol SMP/SML, UBL 2.1
Workflow preview
1. Master Data Intake2. TRN / Peppol Hygiene Scan3. 51-Field Gap Check4. Heavily Impacted Rule Packs
Data flow: Master + 10 Invoices + Contracts/MSA (PDF/Excel) → Hygiene Scan (line-item TIN) → 51-Field Gap Check (1-Fils) → Heavily Impacted Packs → ASP Shortlist & Checklist → Corrected Template + UUID Credit Notes → Sandbox Submission → Go-Live
PINT-AE UAE BIS + Peppol BIS 3.0 + UBL 2.1 • UAE mandates PINT-AE 51-field UBL 2.1 via ASPs — Jan 2027 fov1.0 • Audit trail

Why PINT-AE UAE BIS + Peppol BIS 3.0 + UBL 2.1 wins

UAE mandates PINT-AE 51-field UBL 2.1 via ASPs — Jan 2027 for heavily impacted (Construction, Wholesale, Tech, Energy) with 1-Fils line-item validation, provisional→UUID credit notes and multi-currency MSA. Pre-validation catches line-item BR rejects; no generic ERP covers construction multi-year UUIDs, wholesale 1-Fils, or tech cross-border MSA.

Alternatives: Generic Peppol BIS (fails UAE BRs + 1-Fils), Batch PDF via email (rejected Jan 2027), Full ERP-to-ASP rebuild (6–8 months, too late for SMEs)

How Despatch works — Day 0 — 30 min to first value

Master Data Intake → TRN / Peppol Hygiene Scan → 51-Field Gap Check → delivery. Full 8-step trail collapses below.

01Day 0 — 30 min
Master Data Intake
Upload customer/supplier master (Excel/ERP export) + last 10 invoices (PDF/Excel/ERP). Contract PDFs/MSAs for provisional/milestone (optional).
02Day 1
TRN / Peppol Hygiene Scan
Master Data Agent scans every counterparty for TRN validity, Peppol ID existence, corporate TIN and legal-name mismatches — produces clean master sheet. Catches the single formatting error that halts wholesale.
03Day 1–2
51-Field Gap Check
Validator runs full PINT-AE UAE 51-field check on your 10 invoices — field-level red/amber/green with plain-English fix for each gap, including 1-Fils rounding at line-item.
Full 8-step audit trail
1
Master Data Intake Day 0 — 30 min
Upload customer/supplier master (Excel/ERP export) + last 10 invoices (PDF/Excel/ERP). Contract PDFs/MSAs for provisional/milestone (optional).
2
TRN / Peppol Hygiene Scan Day 1
Master Data Agent scans every counterparty for TRN validity, Peppol ID existence, corporate TIN and legal-name mismatches — produces clean master sheet. Catches the single formatting error that halts wholesale.
3
51-Field Gap Check Day 1–2
Validator runs full PINT-AE UAE 51-field check on your 10 invoices — field-level red/amber/green with plain-English fix for each gap, including 1-Fils rounding at line-item.
4
Heavily Impacted Rule Packs Day 2–3
Industry pack applied: Construction (retention/milestone/provisional→UUID credit notes), Wholesale (1-Fils/line-item TIN), Tech (multi-currency/MSA PO linking), Energy & B2G (hydrocarbon AE + B2G pre-validation).
5
ASP Shortlist & Checklist Day 3
ASP Routing Agent shortlists 2–3 ASPs for your ERP and industry volume, with pricing, cert path, and Peppol SMP registration steps — timed for 30 Oct 2026 appointment.
6
Corrected Template & SOP Day 4
Delivers corrected PINT-AE XML-ready template (your branding), rejection SOP (who fixes what in <24h), and UUID-linked credit-note workflow for adjustments.
7
Simulated Submission Day 5
Dry-run submission via ASP sandbox / Peppol test — proves your sample invoices clear before the voluntary pilot window closes, at line-item level.
8
Go-Live & Monitoring Week 2+
ASP appointment, production cutover in pilot (1 Jul 2026 → ), rejected-invoice monitor (line-item) and FTA VAT-input-claim archive — paid faster by government/enterprise AP.

Which Enterprise Automation use case is yours?

Tap your model — see the exact hinge we test.

Construction, Contracting & Real Estate

Complex provisional billing, milestone payments and retention (5-10%) across multi-year contracts — provisional invoices + UUID-linked e-credit notes for every adjustment, mapped to BG-20/BT-11.

Do nothing
51/51 passed wasted
  • Manual Enterprise Automation process
  • No audit trail
  • • No evidence for inspector/investor
Build in-house
6–12 months • Hire team
  • Hire + train + maintain
  • • No re-run if product changes
  • • Hard to show investor quickly
DespatchAED 5k+/mo
8 steps • Agents • Evidence
  • TRN / Peppol ID Hygiene Scan
  • 51-Field PINT-AE Gap Check
  • Daily watch + re-run

Multi-agent mesh — orchestrated

Live system presentation

Despatch · Agent Mesh

ORCHESTRATOREnterprise AutomationMaster DataACTIVEPINT-AE Validat…NODE 02Industry Rule P…NODE 03Provisional & A…NODE 04ASP RoutingNODE 0512345678
Step 1Day 0 — 30 min

Master Data Intake

Upload customer/supplier master (Excel/ERP export) + last 10 invoices (PDF/Excel/ERP). Contract PDFs/MSAs for provisional/milestone (optional).

Excel/ERP export10 sample invoicesContract/MSA PDFsTRN list

Objections, answered

If it’s not answered, you’ll hesitate. So we answer it here.

UAE's cross-industry PINT-AE readiness engine for the Jan 2027 heavily impacted sectors — Construction & Real Estate, Wholesale/Distribution & Logistics, Technology/Telecom & Professional Services, and Energy & B2G. From dirty PDFs and spreadsheet pricing to 51-field Peppol invoices that clear on first submit — provisional billing, 1-Fils rounding, multi-currency MSA and reverse-charge solved before the mandate. Delivered as 5 specialized agents + 8-step workflow. You get TRN / Peppol ID Hygiene Scan + 51-Field PINT-AE Gap Check and a dated evidence trail.
Production in 2 days • Audit trail

Get Despatch live — without the Enterprise Automation drag.

UAE's cross-industry PINT-AE readiness engine for the Jan 2027 heavily impacted sectors — Construction & Real Estate, Wholesale/Distribution… Implementation: Hygiene & Gap Check → Industry Rule Packs → ASP & Template → Pilot & Go-Live.

Questions? Talk to a human • Responses in < 24h • Human signs every critical step

Evidence + audit trailPINT-AE UAE BIS + Peppol BIS 3.0 + UBL 2.1Deterministic — LLM only for rationale